Department of Environmental Sciences
College of the Environment
Western Washington University

ESCI Field Camp
Schedule & Itinerary
Spring 2025

Instructor: John McLaughlin
Office: ES 434
Phone: 360-650-7617
E-mail:
( Please do not send attachments in proprietary formats.)
Office Hours: by appointment
Field Camp home page: http://faculty.wwu.edu/jmcl/Field_camp/field_home.htm

Program Schedule

Week

Place

Topics

Projects

0 WWU Preparation meetings: TBA
Review research project ideas:
Elwha project ideas
River expedition project ideas
Review research project descriptions
Prepare personal gear
1 WWU/Bellingham
Week 1 detailed schedule
Program overview and orientation
Research design
Wildlife survey methods
Wildlife research ethics
Scientific writing
Conservation design
Grizzly bear PVA
Monitoring avian prod. & survival
Research project team organization
Elwha literature review
Elwha research proposal
Frog aural survey
2 WWU/Bellingham
Week 2 detailed schedule
River restoration and dam removal
Age structure
Spatial structure
Conservation design
Reintroductions & translocations
Population viability analysis
River safety training
Elwha trip preparation
Elwha pilot project
Backcountry environmental briefing
Revised Elwha lit. review
Revised Elwha research proposal
River research literature review
River research proposal
3-4 Tue April 15
7am, lot 12G
Elwha River
Olympic NP






Fri April 25
stair sculpture

Sat April 26
Outdoor Center
Weeks 3-4 detailed schedule
Tue April 15, 7am: meet at lot 12G
Rapid COVID antigen tests, April 15 (required)
Elwha restoration: design & progress
Reconstructing a restoration baseline
Research project development
Research project data collection
Abstract revision

WWU campus: 10am
River rescue methods and practice

River training trip (all day)
River training gear list (OC)
5-6 River expedition
Grande Ronde River













Fri May 9
stair sculpture
Weeks 5-6 detailed schedule
Rapid COVID antigen tests, April 29 (required)
Personal river trip gear list
River trip Environmental Briefing
Grande Ronde River profile, WRC
Grand Ronde W&SR Map
Elbow Creek Fire Map, 2021
River conservation & management
Wild and Scenic Rivers (film)
Leave No Trace principles and practices on rivers
Butterfly survey methods
LWD distribution
Riverbird distributions
Research project development
Conservation prospects

River trip debrief
River Safety Videos, AW 2021
Butterfly-plant relationships
Riverbird distributions
Riverbird analysis template
Riverbird analysis example
Bald Eagle survey
Research project data collection
Scholars week reg. opens April TBA
Registration submission form
7 Mon, Fri, Tue
Lab TBD

Pres.TBD






Thur May 15, 8am
Connelly Creek Natural Area

TBD


Analytical methods
Project-specific consultation:
data analysis & presentation design
Scholars Week Event Schedule
Scholars Week Presentation Schedule
Presentation information
Presentation guidelines
Presentation evaluation criteria
Presentation checklist (Pickett et al. 1991)

Monitoring avian productivity & survival


Design presentations
Presentation information
Presentation guidelines
Presentation evaluation criteria
Research paper preparation




8 TBD

Fairhaven Outback
Outdoor Classroom
5:30 pm
Photo and Video viewing

Awards ceremony and celebration




Project-specific consultation:
data analysis, interpretation, report writing
Research paper preparation
9 WWU Research paper preparation
Research papers(2) due

Course Evaluation:

Grades will be based on:

Due

Weight

ESCI 438 Scientific Writing and Presentation

spring 2025 TBD

ESCI 408 Field Methods in Wildlife Ecology

Lit.search ref.list

April 2

5

Literature review

April 4

5

Literature review, revised

April 11

10

Research project proposal

April 7

10

Research abstract, draft
(Advice for writing abstracts)

April TBA

10

Abstract submission
(form linked @ end of page)

April TBA

Required

Scholars' Week Presentation
Presentation evaluation rubric

May 13-15

20

Elwha Research project report, draft

May 19

5

Elwha Research project report, final

May 30

25

Expedition behavior

throughout

10

ESCI 433 Population Biology

Frog distribution project

April 8

20

Riverbird abundance & distribution project

Apr.30-May 8

20

Riparian raptor survey

Apr.30-May 8

20

Butterfly abundance & distribution project

Apr.30-May 8

20

Expedition behavior

throughout

20

ESCI 409 Riparian Conservation

Lit.search ref.list

April 8

5

Grande Ronde Literature review

April 11

5

Grande Ronde Literature review, revised

April 28

10

River Research project proposal

April 11

20

LWD inventory project

Apr.30-May 8

10

Grande Ronde Research project report, draft

May 16

5

Grande Ronde Research project report, final

May 30

25

Expedition behavior

throughout

20

Return to Field Camp home page

Return to Courses